Stacker bulk material handling
Stacker are large pieces of plant used predominantly to handle bulk materials such as ores and coal. They are typically used with a reclaimer, which recovers the material.
Stackers typically move on a rail between stockpiles in a yard, using traction motors powered by direct current. This allows them two directions of movement – horizontally along the rail and vertically by luffing (raising and lowering) its boom. Some stackers can also rotate the boom, allowing stockpiles to be formed on either side of the rail.
A controller operates the stacker from a cabin which is usually positioned above the boom.
Stackers can stack in different patterns. Cone stacking tends to cause coarser material to move out towards the base in what is known as size segregation. Chevron stacking is where the stacker builds up layers of material while travelling the length of the stockpile.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.